Contact Us

Introduction to Lanxi Yongsheng New Energy Project

Lanxi Yongsheng New Energy Co., Ltd., established in 2017, is a wholly-owned subsidiary of Shenzhen Yongsheng New Energy Co., Ltd. The company is located in Lanxi City, Zhejiang Province. It is mainly engaged in the design, investment and operation of solar photovoltaic power stations and has 3 employees.


The company holds 14.5 MW distributed rooftop photovoltaic projects with a total investment of 80 million yuan, which are located in Lanxi City Hengchang Packaging Company, Jiegao Textile, Lima Yunshan, Tengma Textile, Wenrong Textile, and Zhongdian Electronics Company. Among them, Zhejiang Tengchang The roof of the factory of Ma Textile Co., Ltd. has an usable roof area of 16,000 square meters. The total installed capacity is 1.5MWp, using 295Wp components, a total of 5103 pieces. It is equipped with a total of 3 500kWp inverters and 1 1000KVA and 1 500KVA transformers to boost to 10KV grid-connected; Zhejiang Lanxi Jiegao Textile Co., Ltd. factory roof, with an available roof area of 28,000 square meters. The total installed capacity is 2MWp, using 295Wp components, a total of 6,804 pieces, and a total of 4 500kWp inverters and 2 1000KVA transformers. Pressed to 10KV and connected to the grid; the roof of the factory of Zhejiang Lima Yunshan Textile Co., Ltd. has an available roof area of 54,000 square meters. The total installed capacity is 5MWp, using 295Wp components, a total of 17,010 pieces, and a total of 10 500kWp inverters and 5 The 1000KVA transformer is boosted to 10KV and connected to the grid; the roof of the factory of Zhejiang Tengma Textile Co., Ltd. has an available roof area of 51,700 square meters. The total installed capacity is 3MWp, using 295Wp components, a total of 10,206 pieces, and a total of 6 500kWp inverters and 3 A 1000KVA transformer is boosted to 10KV and connected to the grid; China Electronics Company has a usable roof area of 4,000 square meters. The total installed capacity is 0.4MWp; Zhejiang Lanxi Wenrong Textile Co., Ltd.’s factory roof has a usable roof area of about 30,000 square meters. The total installed capacity The capacity is 3MWp.


The company holds a 14.5 MW distributed rooftop photovoltaic project that was connected to the grid in December 2017, with an estimated annual power generation of 14.5 million kWh.


Project pictures:


Introduction-to-Lanxi-Yongsheng-New-Energy-Project-1.jpg


Introduction-to-Lanxi-Yongsheng-New-Energy-Project-2.jpg


Introduction-to-Lanxi-Yongsheng-New-Energy-Project-3.jpg


Introduction-to-Lanxi-Yongsheng-New-Energy-Project-4.jpg




Products

Contact Us

We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies. Visit our cookie policy to learn more.
Reject Accept